Tibet accelerates the construction of small towns

2022-08-13
  • Detail

Guide to accelerating the construction of small towns in Tibet: a few days ago, we learned from the on-site exchange meeting on the construction experience of small towns (market towns) in the whole region held in Bayi Town, Nyingchi Prefecture that since the third central Tibet work symposium, the construction of small towns (market towns) in Tibet has entered a stage of rapid development and achieved gratifying results. At present, the whole urban area

recently, it was learned from the on-site exchange meeting on the construction experience of small towns (market towns) in the whole region held in Bayi Town, Nyingchi Prefecture that since the third central Tibet work symposium, the construction of small towns (market towns) in Tibet has entered a stage of rapid development and achieved gratifying results

at present, the preparation of the regional system planning of cities and towns in the region has been basically completed, and the overall planning of cities and towns in the region and 71 counties has been approved. Special plans for the protection of famous historical and cultural cities in Lhasa, Shigatse and Gyangze counties are also being prepared

the municipal infrastructure of the cities and towns where the region is located has been basically improved, the construction of urban trunk roads has been completed, and some secondary trunk roads and branches have been built, and the main framework of urban roads has been basically formed. The urban water supply and drainage system has been improved, especially the open material, which has solved the problem of water supply and drainage in cities and towns. Urban landfills are under construction or demonstration, and the phenomenon of "dirty, messy and poor product quality" in cities and towns has been treated to a certain extent; The municipal infrastructure construction of the towns where the county seat is located is becoming more and more perfect. The road system of the county seat has begun to take shape. The water supply project has been basically completed, and the drainage project is under construction

in terms of public service facilities construction, public service facilities such as squares, markets, parks, postal services and telecommunications have been built in the cities and towns where the region is located, and community public service facilities have also begun to be built; The towns where the county seat is located are equipped with market facilities on the basis of the original public service facilities such as posts and telecommunications and communications

some counties have also built public service facilities such as squares and parks. With the efforts of relevant departments, the region will basically build an external transportation network of "oil roads in counties and roads in villages" during the Tenth Five Year Plan period. Communication, energy and other infrastructure will also be further improved

in the institutional reform, various regions have successively established and improved urban maintenance and management teams such as urban sanitation, maintenance, greening, urban management, and most counties have also established reading: refer to the records of fault analysis and repair in the technical archives of tensile testing machine; Check daily inspection card, spot inspection card and regular inspection card; Check the shift records and the records of protection and maintenance. The construction administrative department has allocated personnel and equipment, and the construction and management level of urban planning in the whole region has been greatly improved

Copyright © 2011 JIN SHI